Article Date: 10/25/2008


BIOMIMICRY: THE POWER OF SPINACH


by Stephanie Aurora Lewis, RA, LEED

Spinach-powered photovoltaic panels were at the heart of an award-winning cradle-to-cradle home design by Matthew Coates and Tim Meldrum. The C2C concept, coined by Walter Stahel and popularized by William McDonough and Michael Braungart, redirects material waste from a linear management plan (harvesting, manufacturing, consumption, then ... Log in to view the full text.

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

Already a member?

Email:

Password:











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account